The essence of technology

Monolithic house - it is not a prefabricated structure, which consists of individual elements - blocks, panels, bricks, but is a one-piece structure. Construction involves the use of formwork, where concrete solution is poured. So, a building or its supporting structure - floors and load-bearing partitions - is cast in stages.

The total weight of monolithic houses is lower than that of stone and panel buildings. For the same strength, their walls are slightly thinner, and this increases the usable interior space.

The expansion of the living space reaches 17% with similar external dimensions. Low weight makes it possible to build even on problem soils prone to heaving.

The advantage of monolithic houses:

High construction speed

Strength and durability

Freedom of architectural thought

High energy efficiency

Construction in any season

Monolithic houses are built faster than brick ones.
The house can be fully built in a season.

The main stages of construction

Geological and topological exploration is being carried out at the site. It is necessary to correctly determine the type of soil and its composition, the depth of the groundwater, the level of soil freezing and other important indicators.

An extremely important stage is the development of a house project. It includes design estimates. It includes the necessary drawings for building a house and an estimate.

The foundation axes are marked on the site. after which land works are carried out. The formwork is installed, the reinforcing belt and the foundation is poured.

After that, the reinforcement cages of the walls are assembled. Formwork of walls and ceilings is being assembled. A reinforcing belt is installed. Then the walls and floors are poured with a concrete mixture. In the process of pouring, it is vibrated with a deep vibrator.

    What was done

    Project: the Innsbruck project was adapted to the site and the wishes of the customer's family, a solution was proposed to move the terrace.
    foundation: based on geology and the architect's calculations, the house was erected on a pile-grillage foundation.
    floors: basement - solid concrete; interfloor - reinforced concrete floor slabs.
    box: walls made of aerated concrete blocks, laying on masonry glue. Windows are made to order, with one-sided lamination, on-site installation.
    roof: metal tiles.
    exterior finish: walls are insulated with basalt facade insulation and plastered, finishing elements are made of wood, made on site, based on TZ-visualization, painted. The plinth is lined with decorative stone.
    interior finishing: finishing was carried out according to the design project, where the combination of decorative plaster with stone and wood was taken as a basis. False beams were mounted on the ceilings.
    additionally: a fireplace is installed and finished.

    What was done

    The very case when our Customer and we speak the same language and are inspired by the ECO high-tech style! Designer Ilya came to us with a ready-made Design of his future home! Our team liked the project - such unusual and stylish solutions are always a professional challenge!
    We have prepared estimates for Ilya and developed unique design solutions - all this allowed us to implement this project! The frame house is made in our proven Canadian technology with 200 mm insulation along the entire contour! Outside, the house is sheathed with imitation timber. All windows are custom-made and laminated in project colors. Additional accents are highlighted by the professional bar imitation dyeing and color matching.

    What was done

    What should we build a house for? Indeed, having a team of professionals and knowledge - building a house from scratch is a matter of time! But sometimes the task is more difficult! We have introductory - the already existing foundation, or buildings on the site, extensions to existing buildings and much more! For the Matsuev family, it was just such a difficult task. They had a foundation from an old burnt-out house, and a landscaped area around it! The new house had to be built in a short time on the existing foundation. Dmitry and his family had a desire to build a new high-tech house. After careful measurements, a project was made that took into account the old layout, but had a new modern shape with interesting innovations! The house has an entrance lobby where you can sit at a table on cozy evenings and a complex but possible exploited roof in our strip. To implement such a roof, we called on our knowledge and modern building materials for LVL beams, welded roofing and much more. Now in the summer on such a roof you can arrange an unusual dinner or watch the stars at night! In the decoration, our architect also emphasized the minimalist and graphic high-tech style. Smooth plastered walls with painted planken detailing, personality added by wood beams at the entrance. Inside, the house is finished with imitation timber, which is painted in different colors depending on the purpose of the room! Large windows in the kitchen of the living room overlooking the plot - created the desired effect of illumination and airiness of the space! The house of the Matsuev family - decorated our photo gallery in the section of suburban architecture in the high-tech style, in the style that courageous Customers with excellent taste choose.

    What was done

    Olga and her family have long dreamed of a country house! A reliable, solid home for life, which will perfectly fit into their difficult narrow area! With the advent of children, it was decided to make the dream come true, children grow up quickly and in their own home in nature there are many opportunities and fresh air. We, in turn, were happy to work on an individual project of a classic-style red brick house with a bay window! After the first acquaintance with our company in a cozy office, we invited Olga to take a look at our existing construction site: evaluate the order and construction processes, storage of materials on the site, get to know the construction team, and make sure of the quality of work. After visiting the facility, Olga decided to work with us! And we were glad to do our favorite job again to make another country dream come true!

    What was done

    Project: changes were made to the San Rafael project and redevelopment was made according to the wishes of the Customer.
    floors: basement -zhb floor slabs; interfloor - reinforced concrete floor slabs
    box: walls made of expanded clay concrete blocks, laying on mortar ??? Windows inserted.
    roof: metal roofing
    terrace: rough enclosing elements are made, flooring is made.

    What was done

    Dmitry contacted our company with an interesting draft design to calculate the cost. Our experience allows us to carry out such calculations for draft designs with minimal errors, no more than 2%. Having visited our construction sites and received the construction cost, Dmitry chose us from many of our colleagues in the workshop to complete the project. Our team has embarked on a challenging and expressive countryside project with spacious rooms and a garage, large windows and sophisticated architecture. After the delivery of the project, Dmitry chose us as a contractor company, and we, in turn, wanted to do further work at the same high level! Since the object is large, Dmitry proposed a phased cooperation, namely, upon successful completion of the foundation work, we proceeded to the second part of the project - walls + floors + roof. Also for Dmitry, the exact timing of construction was important, in order to speed up the construction processes, the team was reinforced by 2 experienced bricklayers.
    The box on the pile-grillage foundation was delivered on time! The result pleased us and the customer. All stages of the work were agreed and worked out for Dmitry and his individual project, from which all participants in the process benefited!

    What was done

    Project: The project of our company Inkerman, was changed taking into account the wishes of the Customer's family, the house was planted on the site, taking into account the existing situation on the site and the relief
    foundation: based on geology and the architect's calculations, the house was erected on a reinforced pile-grillage foundation.
    floors: wooden on wooden beams, in places of large spans, installation of LVL beams. The basement floor is insulated with 200mm basalt insulation; floor slab with noise insulation 150mm.
    box: box: walls made of expanded clay concrete blocks, laying on mortar. Windows inserted.
    roof: installation of metal tiles.
    exterior finish: the facade is insulated with 100 mm basalt facade slabs, the facades are covered with facing bricks; the color scheme was proposed by the architect and agreed with the customer.

    What was done

    The Krutov family decided to build a spacious house for the whole family!
    Olga and other family members went from idea to implementation in several stages! The choice of technology, long work on the project, construction of the foundation, construction of a house with exterior decoration and then work on interior decoration! The frame technology has been chosen as energy-saving, pre-fabricated and high-tech! Why did the Krutovs choose our company? They liked the quality of the work on our construction site and the workers who gave a detailed tour! We also worked on the estimate for a long time, combining different finishes, comparing their cost. This made it possible to choose the best option from a wide variety of finishing materials and configurations.
    The project was created by a friend of the architect, but we had to work out its constructive part. After that, the most reliable and effective foundation was erected - the USP. Next, work began on the box. Frame house with 200 mm insulation along the entire contour and a unique roof insulation technology of 300 mm. For the exterior, siding was chosen in a spectacular combination of colors - coffee and cream. The accents are highlighted by the powerful overhangs, the interfloor belt and large windows!

    What was done

    When you decide to become the happy owner of your own home and move to a new home for permanent residence, first of all you think about what the house will be like; what to build it from; how much will it cost and, most importantly, WHO will do all this?
    Alexander, came to our company with the desire to move to his own country house. He liked the Avignon project and there was already a strip foundation on the site. After the initial visit to the site, measurements and examination of the foundation, we gave our conclusions and recommendations. Strengthen the foundation, change and adapt the project to the dimensions of the existing foundation! After agreeing on the cost, it was decided to build in winter. Alexander received as a gift reinforced concrete floors, one of the leading construction teams and a house according to the project he liked, which stood on a site with an external finish by the spring! Alexander watched every stage of construction, regularly visiting the construction site and was pleased with the result, and we were with our work. This is an individually designed Avignon project, realized in stone technology with external insulation and siding!

    What was done

    Each house is a separate story of creation and implementation! Once we built a house for good people and they recommended us to another good person! Andrey Rumyantsev came to our company with a desire to build a one-story spacious country house with a fireplace for warm family evenings instead of an old country house ... The customer voiced his wishes for finishing - and we, in turn, brought everything to life. Thanks to the detailed visualization of the project, each element of the exterior finish is a member of a friendly ensemble! Bavarian masonry, as the final stage of exterior decoration, looks noble and solid. Without a doubt, such a tandem - aerated concrete and brick can be safely called the best solution in the field of stone housing construction - warm, affordable, beautiful, reliable. Modern technologies have stepped forward so much that such unique configurations become available in a short time, because we built this project during the winter months. The main thing is to have the necessary knowledge and constantly replenish their stock!

    What was done

    Project: the project of a European company was taken as a basis and was adapted to the site and the wishes of the Customer's family, a terrace and patio were proposed, taking into account the cardinal points of the Customer's site.
    foundation: on the basis of geology and the architect's calculations, the house was erected on a pile foundation.
    floors: basement - solid concrete; interfloor - wooden on beams with 150 mm noise insulation.
    box: walls made of aerated concrete blocks, laying on masonry glue. Windows are custom made with one-sided lamination, on-site installation.
    roof: metal tiles.
    exterior finish: walls are insulated with basalt facade insulation and plastered. Based on the visualization, added facade panels under the Tolento stone. The enclosing elements of the terrace, balcony are made of wood, made on site, based on the technical specification visualization, painted. The eaves of the roof are lined with soffits in the color of the roof.

    Vladimir Murashkin,

    House owner "individual 8x9m"

    House parameters:

    What was done

    When Customers come to us with bright, modern ideas for the future home, we light up twice! After all, to work on a new stylish project is always interesting and a kind of challenge, how to implement all bold ideas from a constructive point of view, what materials to use in this case? Vladimir bought a plot with picturesque views of the Oka River! This view could not be ignored, so a dizzying terrace (51.1 m2) and a large balcony, oriented towards beauty, became an indispensable attribute of the future house! Vladimir wanted to have a rest in nature in a wooden house, but it was necessary to build a house in a short time and the frame construction technology became an ideal solution for such tasks! If you really differ, then in everything! The house was made even more spectacular by a vertical finish imitating a timber made of durable larch, painted in natural shades with an emphasized wood texture. Laminated windows complement the modern look of the house! It turned out to be a great country house, with a twist and at the same time incredibly functional.

Construction of monolithic country houses in Moscow and the region ...

MONOLITHIC HOUSES - BUILD TURNKEY

We carry out turnkey construction of monolithic houses in Moscow and the Moscow region at a price of 11,000 rubles per square meter. This price includes professional removable formwork, foundation, walls, roof, screed. When concluding a contract, design is carried out free of charge. Monolith house - warm, durable, inexpensive - a real know-how of the 21st century. Nevertheless, such a cottage requires mandatory insulation, ventilation devices. Working with the SVS company you will receive:

  • exact adherence to deadlines;
  • formal agreement;
  • warranty from 20 years;
  • detailed fixed cost estimate;
  • photo and video reports, online broadcast from the construction site.

Note that our company does not use subcontracting. There are 50 full-time teams, engineers, foremen with specialized education. In our own design studio, hundreds of ready-made projects of monolithic houses have been developed, prices for construction have been calculated. We also carry out individual design.

PROS AND CONS OF MONOLITHIC HOUSES

Monolithic houses have already shown reliability and environmental friendliness. The construction process, with professional formwork, is fast. A two-storey cottage 10x10 can be built in 2 months. It should be noted that mandatory insulation, facade cladding is required, however, it would not be entirely correct to call this a minus, but rather a feature of the technology.

FEATURES OF THE TECHNOLOGY OF CONSTRUCTION OF MONOLITHIC HOUSES

In the monolithic construction of a private house, it is important to correctly install the formwork and tie the frame from the reinforcement. Then the structure will be reliably protected from external factors, subsidence, and even be able to withstand seismic activity. It is important to use professional formwork that can withstand the enormous pressure of concrete without deformation. To create a reinforcement cage, employees of the SVS company take steel reinforcement with a diameter of 14 mm, 16 mm. The corners are knitted in accordance with the design scheme. A concrete solution is poured on slag with a grade of at least M350. The concrete is tamped with a deep vibrator to eliminate voids.

The technology of building monolithic houses allows you to bring to life any curvilinear and bizarre shapes. It should be noted that the employees of the SVS company use their own formwork, which allows to reduce the cost of low-rise housing construction in Moscow and the region.

In fact, a monolith house is like a house built of artificial stone. After all, concrete is based on crushed stone, sand and cement. Such a structure definitely needs thermal insulation. The company "SVS" works in compliance with SNIPs, GOSTs, there are necessary SRO approvals.

THE COST OF A MONOLITHIC HOUSE AND WHY IT DECREASES

The cost of building a monolithic house in Moscow, first of all, is influenced by the relatively low labor costs during its construction than, for example, in brick construction. The thickness of reinforced concrete walls is usually 10-15 centimeters. At the same time, the bearing capacity is high. A ten-centimeter monolith can withstand twice the load than a half-meter brick wall. The price will also depend on the availability of formwork at the construction team. After all, if the installers rent it, then this amount is automatically reflected on the customer.

Monolithic house, even the name sounds solid. And it is really thorough, reliable and durable. How can a house be rated in this category? The best, because what can compare with it, across the entire spectrum of characteristics? We can safely say turnkey monolithic house will serve you and your loved ones for more than one generation. The implementation of this technology is very difficult, there are many nuances and hidden problems in it. In such a difficult matter, professionals are required and DomaSV they are. How to comply with all norms, reduce defects to zero and complete the project as efficiently as possible? You just need to have the right education, be able to work in a team and have considerable experience in performing this type of work. And these qualities will make it possible to produce monolithic construction of a private house at the highest level.

Monolithic construction, albeit not the cheapest option, still occupies a leading position in the construction markets of stone houses. High-rise skyscrapers and houses on problem soils, boiler pipes and many other buildings subject to significant loads. Worldwide make up projects of monolithic housesto provide yourself with a reliable home. Construction technology has been developed for a long time and has proven itself over the years of operation. That is why we boldly took it to work and for several years we have been successfully building houses on its basis.

Well, if we compare with most other companies, then our turnkey monolithic houses projects and prices will turn out to be significantly more attractive both financially and in the variety of your choice.

Accuracy is important

Construction is always difficult and there is no place for bad contractors, every detail is important. After all, everything in the house depends on everything. From the correct calculation of the foundation and through all stages to the very ridge of the roof.

That is why we have our own staff of proven designers who will develop an individual project for a combined house. Company builders DomaSV these are specialists and, unlike the candidate's neighbor about all sorts of sciences, they can not only disassemble the project, but also explain why it should be done this way.

Precisely because we have a staff of qualified specialists, we can say that turnkey construction of monolithic houses this is not an easy matter and every detail is important in it.

Natural result

Many of us are faced with unskilled care, be it medical, locksmith or any other. So in construction, you always need to thoroughly know a certain array of information. Otherwise, you can get the exact opposite result.

Firm DomaSV for more than 8 years in the construction market and we have more than 400 projects completed inside and out. A lot of positive reviews from regions throughout Russia. We never chase after quantity, our priority is quality and maximum mutual understanding with the client. What exactly does our customer want: individual design, cost savings or a house that will last for decades. Or maybe all together? Impossible?

This is quite feasible. We have our own production and qualified personnel, reliable partners and recommendations of hundreds of people.

And in the end, we can safely say, build monolithic house projects and prices pick up, everything is pretty simple. We are always in touch and ready to help you build your dream home.